Status
Ongoing
Length
138km
Volt
220kV

Financier
Exim Bank, India

Contractor
Jyoti Structures Ltd

Scope

138km 220kV line, Turkwel – Ortum – Kitale & 3No. substations Lot 1B;138km,220kv Transmission Line.

 

Benefit

Connect load centres of Ortum, to National Grid so as to improve access to reliable power, provide an alternative transmission evacuation route for Turkwel power plant