We are building and strengthening our capacity to undertake operation of the transmission system and power management. In this regard, a key planned project is to construct a National Load Dispatch (Control) Centre.
Further, we continuously identify more transmission line projects that will evacuate the projected power supply and extend the national grid effectively, while simultaneously developing linkages with power generators and distributors in order to scale-up generation and evacuation of renewable energy that can continuously be harnessed and inexhaustible in supply.