Thika – Kiganjo (Nyaga)
[ All Projects ]
| PROJECT INFORMATION | |
|---|---|
| Project: | Thika – Kiganjo (Nyaga) |
| Objectives: | To improve poor terminal voltages, low connectivity, high system losses |
| Scope: | 30km, 132kV Single Circuit Transmission Line , 132 kV substation works at Thika, 23 MVA 132/33 substation at Mangu, 23MVA 132/33 substation at Nyaga; |