Loiyangalani - Suswa


[ All Projects ]

PROJECT INFORMATION
Project: Loiyangalani - Suswa
Remarks Commencement date 2010/11
Objectives:

A 428 km 400 kilovolt (kV) transmission will transport the power generated by the the Lake Turkana Wind Power (LTWP) project to the national grid at Suswa (near Longonot), via Baragoi, South Horr, Marti, Morijo, Longewan, Rumuruti and Olkalau. The transmission line will be accessed from the South Horr, Baragoi, Malaral, Rumuruti, Nyahururu, Gilgil and Narok main road.
 

A power transmission substation will be built at the Loiyangalani project site and a new terminal substation will be constructed at Suswa to connect to Olkaria for grid-feed in.