Thika – Kiganjo (Nyaga)


[ All Projects ]

PROJECT INFORMATION
Project: Thika – Kiganjo (Nyaga)
Objectives:

To improve poor terminal voltages, low connectivity, high system losses

Scope:

30km, 132kV Single Circuit Transmission Line , 132 kV substation  works  at Thika, 23 MVA 132/33 substation at Mangu,  23MVA 132/33 substation at  Nyaga;